Know when each upgrade pays back—and what to do first
Enter your rates, climate, and equipment ages. Get a now/next/later sequence for air sealing, ducts, heat pumps, and water heaters with payback estimates.
Avoid emergency replacements
Stage projects before equipment fails. We flag anything over 12–15 years old.
Real payback windows
Your rates + your climate = rough payback ranges, not generic averages.
Comfort-first sequencing
Drafts and hot rooms push envelope work higher in the queue.
Build your upgrade sequence
Adjust the numbers until the payback windows make sense for your home. Use copy/PDF to share with a spouse, contractor, or energy advisor.
Your home profile
All data stays in your browser
Sequence upgrades so they pay back instead of colliding.
Optimize setbacks, humidity, and staging so existing equipment runs less while staying comfortable.
Seal and right-size ducts so future heat pumps run efficiently and quietly.
Seal big leaks and hit code-level attic R-values before replacing equipment.
Swap the tank before it fails and cut water heating bills with a heat pump unit.
Replace the furnace/AC with a variable-speed cold-climate heat pump sized after envelope work.
Reserve a 240V circuit or panel upgrade so electrification projects don’t stall during emergency replacements.
Upgrade details
Payback estimates based on your rates and climate
Smart thermostat & schedules
NextOptimize setbacks, humidity, and staging so existing equipment runs less while staying comfortable.
Duct sealing + airflow balancing
NextSeal and right-size ducts so future heat pumps run efficiently and quietly.
Air sealing + attic insulation
NextSeal big leaks and hit code-level attic R-values before replacing equipment.
Heat pump water heater
NextSwap the tank before it fails and cut water heating bills with a heat pump unit.
Heat pump for heating & cooling
NextReplace the furnace/AC with a variable-speed cold-climate heat pump sized after envelope work.
Panel / circuit readiness
NextReserve a 240V circuit or panel upgrade so electrification projects don’t stall during emergency replacements.
All data stays on this page
No login required. Update inputs when rates change or after you finish a project.